Products:Wire Harness

  • Complete Inline Fuse Solution series: 2A~125A, DC2000V max
  • Comprehensive copper-aluminum cable transition solutions: 14Awg~0awg
  • Revolutionizes traditional construction methods by eliminating quality risks associated with on-site manual wiring
  • Incorporates standardized factory production to ensure professional inspection of every connection point
  • Significantly reduces failure rates caused by poor contacts, with operational maintenance costs potentially decreasing by over 40%

Pre-assembled Wiring Harness Solutions - The Smart Choice for Efficient PV Systems

In the field of photovoltaic power farm construction, the adage “time is money” holds particularly profound significance. Within project cost structures, the value of cable routing – a critical component – is frequently severely underestimated. The application of pre-assembled wiring harness technology precisely unlocks new dimensions of cost reduction and efficiency improvement for developers: field test data demonstrates that adopting pre-assembled solutions can reduce total system costs by up to 30%.

Even more noteworthy are the exceptional quality advantages offered by pre-assembly technology:

  • Complete Inline Fuse Solution series: 2A~125A, DC2000V max
  • Comprehensive copper-aluminum cable transition solutions: 14Awg~0awg
  • Revolutionizes traditional construction methods by eliminating quality risks associated with on-site manual wiring
  • Incorporates standardized factory production to ensure professional inspection of every connection point
  • Significantly reduces failure rates caused by poor contacts, with operational maintenance costs potentially decreasing by over 40%